Single & Multi-story /
Permanent or Re-locatable Construction

CLASSROOMS THAT MEET FLORIDA HURRICANE
CODE
(Click photos to
enlarge)

ABOVE:
Photos taken 09/24/2004,
days following the 4th hurricane to hit Florida within 45-days. Our
newly constructed concrete school sustained no damage.
Steel-reinforced Poured Concrete
Construction
Twelve (12) classroom school built from 32
systems-built modules
Each classrooms built
in
2 modules weighing-in at... 110,000 pounds!
This reinforced concrete school was
built to withstand winds of 150 m.p.h. (min.), and shipped from
MILLER concrete plants in Pennsylvania and Indiana. Upon delivery,
MILLER CONSTRUCTION SERVICES (MCS) was
on-site to assist in completing this project.
__________________________________________
PERMANENT and RE-LOCATABLE
PROJECT GALLERY
(Click photos to
enlarge)





__________________________________________
DAY CARE CENTER (6,160 sq ft)
Adding the finishing touches to this
steel-frame, systems-built, modular daycare center!
This Illinois day care center consists
of 8 steel-frame modules set to a permanent foundation with 2-foot
crawl. Interior features include factory built or installed walls
and wall coverings, ceiling, electrical and
plumbing with fixtures and cast iron pipe sprinkler system. Real brick
was applied on-site giving this building a true site-built
appearance.